Ben Dinh bridge
• Location: Ben Cau – Go Dau, Tay Ninh
• Period of design: Feasibility Study and Detailed Design
• Parts schema: 3 x 33,0 m + (42,0 m + 63,0 m + 42,0 m) + 4 x 33,0 m, total bridge length round 379,5 m.
- Main part used high solidconcreteempty balanced forming.
- Connection parts are simple concrete made in factory.
• Bridge size: 12 m : 2 lanes vehicle + 2 lanes for bike.
 



;