Thoi An Bridge
• Location: Ben Cat, Binh Duong.
• Period of design: Feasibility Study and Detailed Design.
• Part schema: (60 m + 90 m + 60 m) +4 x 33 m; total bridge length round 340 m.- Main part used high solidconcreteempty balanced forming.
- Connection parts are simple concrete made in factory.
• Bridge size: 17 m : 4 lanes + equal sides walk.
 



;