794 road
• Location: Tan Chau, Tay Ninh
• Period of design: Feasibility Study Project.
• Technical standard: Design by vehicle road level II, speed 80km/h.
• Line length 35km, items: traffic road, rain exhaust, bridge.
• Horizontal cut: 22,5 m : 4 vehicle lanes + 2 bike lanes. Concrete road surface.
 
;