High level national road 13
• Location: Thuan An town, Thu Dau Mot, Binh Duong
• Period of design: Feasibility Study Report
• Tecnical standard: Design by vehicle road level II, speed 80km/h.
• Size: dry bridge 25km long, horizontal cut: 4 vehicle lanes 18m

 



;