Tan Do Industrial Park
• Construction location: Duc Hoa Dist., Long An Province.
• Period of design: Feasibility Study Project and Technocal-detailed Design
• Total area is 300 ha, road is 40 km long, width of road is 12-52m with 2-4 lanes. 
• Main items: road, drainage, water delivery, lighting, position of trees, Tan Do bridge: 2x24.54+18,6m; width of bridge is 18m.

 
 
;