Tan Nam Road and Bridge
• Location: Tan Bien, Tay Ninh province.
• Period of design: Feasibility Study and Technocal Design.
 
Road:
• Tecnical standard: Design by vehicle road level IV, speed 60km/h..
• Horizontal cut: 9m.
 
Bridge size: 8m with 2 vehicle lanes.
 









 
;