  • • Location: Trang Bang, Tay Ninh province. • Period of design: Feasibility Study and Technocal Design. • Tecnical standard: Design by vehicle road level III, speed 80km/h. • Line length 5km, items: traffic road, rain exhaust. • Horizontal cut: 12m: 2 lanes for vehicle.
  • • Location: Nhon Trach – Long Thanh, Dong Nai • Period of design: Detailed Design. • Line length 14km, items: traffic road, water irrigation, lighting electricity, green tree, walking tunnel, bridge length 12,5m. • Horizontal cut: 80 m : 10 lanes + side walk.
  • • Location: Tan Chau, Tay Ninh • Period of design: Feasibility Study Project. • Technical standard: Design by vehicle road level II, speed 80km/h. • Line length 35km, items: traffic road, rain exhaust, bridge. • Horizontal cut: 22,5 m : 4 vehicle lanes + 2 bike lanes. Concrete road surface.
  • • Location: Ben Cat, Binh Duong. • Period of design: Feasibility Study and Detailed Design. • Part schema: (60 m + 90 m + 60 m) +4 x 33 m; total bridge length round 340 m.- Main part used high solidconcreteempty balanced forming. - Connection parts are simple concrete made in factory. • Bridge size: 17 m : 4 lanes + equal sides walk.
  • • Location: Trang Bang Dist, Tay Ninh •Period of design: Feasibility Study Project and Detailed Design. • Size: Surface 760ha with 54km traffic road • Main items: traffic road, rain exhaust, used water irrigation, water supply, lighting electricity, green tree
  • • Location: Tan Bien, Tay Ninh province. • Period of design: Feasibility Study and Technocal Design. Road: • Tecnical standard: Design by vehicle road level IV, speed 60km/h.. • Horizontal cut: 9m. Bridge size: 8m with 2 vehicle lanes.
  • • Location: Ben Cau – Go Dau, Tay Ninh • Period of design: Feasibility Study and Detailed Design • Parts schema: 3 x 33,0 m + (42,0 m + 63,0 m + 42,0 m) + 4 x 33,0 m, total bridge length round 379,5 m. - Main part used high solidconcreteempty balanced forming. - Connection parts are simple concrete made in factory. • Bridge size: 12 m : 2 lanes vehicle + 2 lanes for bike.
  • • Location: Bien Hoa city and Long Thanh district, Dong Nai province. • Period of design: Feasibility Study and Detailed Design • Parts schema: 4 x 33,0 m + 3 x 40 m + 5 x 33 m. • Bridge size: 17 m with 4 lanes vehicle.
  • • Location: Duong Minh Chau, Tay Ninh province. • Period of design: Feasibility Study and Technocal Design. • Tecnical standard: Design by vehicle road level III, speed 80km/h.. • Horizontal cut: 12m.
  • • Construction location: Duc Hoa Dist., Long An Province. • Period of design: Feasibility Study Project and Technocal-detailed Design • Total area is 300 ha, road is 40 km long, width of road is 12-52m with 2-4 lanes. • Main items: road, drainage, water delivery, lighting, position of trees, Tan Do bridge: 2x24.54+18,6m; width of bridge is 18m.
  • • Location: Bien Hoa, Dong Nai • Period of design: Feasibility Study Report
  • • Location: Thuan An, Di An and Thu Dau Mot town, Binh Duong. • Period of design: Feasibility Study and Technocal Design. • Line length 30km, consist of 22 unconnected bridges and 4 unequal connected intersection. • Horizontal cut: 28m: 4 lane for vehicle + 2 emergency stop lanes.
  • • Location: Thuan An, Phuoc Khanh town, Tan Uyen district, Binh Duong Province. • Period of design: Feasibility Study and Technocal Design. • Technical standard: Design by vehicle road level III, speed 50km/h.